Insights
Engineering notes for equipment decisions
Checklists, decision frameworks and evaluation methods from real equipment projects — written for the engineers who have to defend the decision afterwards.
12 inputs to define before starting a Si DRIE project
Most DRIE projects that stall share one root cause: the application was never fully defined. Here are the twelve inputs to pin down first.
Read articleHow to define success for a deep silicon etch demo
A single beautiful cross-section photo proves very little. What a meaningful DRIE demo looks like, and the criteria to agree in writing before processing starts.
Read articleVertical vs horizontal batch furnaces: a selection framework for oxidation, diffusion and LPCVD
Batch thermal processing remains the quiet backbone of power and sensor fabs. A framework for the vertical-vs-horizontal decision, and the evaluation data that actually settles it.
Read articleSpecifying a PECVD film: stress, hydrogen, coverage and thermal budget
A film spec that says '1 µm of SiN' tells a supplier almost nothing. The five properties that decide whether a PECVD film works in your device — and how to state them.
Read articleHave a structure, film or thermal step to discuss?
Send a short description of your application — device type, material, wafer size and what a good result looks like. An engineer will reply with a concrete next step.
